Maejo University has a piping system that collects wastewater from all buildings and transports to
MJU wastewater treatment plant and subsequently collects and transfers the treated water to 61 distribution
points as illustrated by the 3 main pipe lines on the map consist of pipe size are 160, 110 and 63 mm. Three
of the distribution points further move the water to ponds for agricultural reserve, seven points supply water
for usage in glass field agriculture, the university forest garden, and one additional point flows to a natural
canal.
(Video : https://drive.google.com/file/d/1z5HICEHfrjSPcDuxg_x9o_tfdZtJnafa/view?usp=drivesdk)
The treated water of Maejo University between October 2023 to September 2024 has a total volume
of 449,595 m3. All treated water was supplied into pile lines for agricultural use, such as landscape and
garden.